7 bedroom mansion House Plan for a Large Family

KSh10,000.00
BUY NOW

7 bedroom mansion House Plan for Large Family in Kenya

General 7 Bedroom Architect Notes

  • All dimensions are shown in m unless  otherwise specified.
  • Drawings are not to be scaled. Only figured dimensions to be used.
  • The contractor must check and verify all dimensions on site before commencement of any work.
  • Construction Civil Structural Of 7 Bedroom House
  • All black cotton soils to be removed from below all buildings and paved surfaces.
  • Buildings to be clear of black cotton soil to a distance 3m outside the perimeter
  • All paved surfaces to be clear of black cotton soil to a distance of 500mm outsite the edge the
    surface.
  • All walls less than 200mm thick to be reinforced with hoop irons at every alternate course.
  • For all R.C work refer to Structural Engineer’s detail.
  • Depth of the foundation to be determined on site to S.E’s approval.
  • All adjacent rc work and masonry walls to be tied with strap irons at every course.
7 bedroom house design in kenya

7 bedroom house design in Kenya/Photo Source

Mechanical Work

  • All plumbing and drainage to comply with city council specifications
  • All service ducts to accessible from all floors
  • SVP denotes soil vent pipe, to be provided at the head of the drainage
  • Drains passing beneath buildings and driveways to be encased in 150mm concrete
    surround.
  • All underground foul and waste drain pipes shall be upvc to comply withBSS5255
  • All inspection chambers covers and framing shall be cast iron to  comply with BS497 TABLE 2
    GRADE A.
  • The storm water pipe to comply with BS 556.
  • Minimum slope in the drain to be 1%.
  • No chases will be allowed in the slabs for thepipes .
  • Sleeves will be  allowed with written approval of thr SE.
  • No cutting of concrete without the express approval of the Architect or S.E.
  • All testing of pipes must be completed before plastering.
  • All mechanical work must be coordinated with electrical and any conflicts must be clarified before work begins.
  • PV denotes permanent ventilation.

Electrical

All conduits must be laid before plastering

File Details

  • Format: pdf
  • Size: 1.0 mb

Reviews

There are no reviews yet.