3 Bedroom Contemporary House Plan in Kenya

3 Bedroom Contemporary House Plan
KSh500.00
BUY NOW

Get this 3 Bedroom contemporary house plan for a medium family in Kenya.

3 bedroom House Plan General Information

All dimensions are shown in mm unless otherwise specified.

Drawings are not to be scaled. Only figured dimensions to be used.

The contractor must check and verify all dimensions on site before commencement of any work.

House Construction Civil and Structural Information

All black cotton soils to be removed from below all buildings and paved surfaces. Buildings to be clear of black cotton soilto a distance 3m outside the perimeter

All paved surfaces to be clear of black cotton soil to a distance of 500mm outside the edge the surface.

All walls less than 200mm thick to be reinforced with hoop irons at every alternate course.

For all R.C work, refer to Structural Engineer’s detail.

Depth of the foundation to be determined on site to S.E’s approval.

All adjacent rc work and masonry walls to be tied with strap irons at every course.

Mechanical information

All plumbing and drainage to comply with city council specifications

All service ducts to accessible from all floors

SVP denotes soil vent pipe to be provided at the head of the drainage

Drains passing beneath buildings and driveways to be encased in 150mm concrete surround.

All underground foul and waste drain pipes shall be upvc to comply withBSS5255

All inspection chambers covers and framing shall be cast iron to comply with BS497 TABLE 2 GRADE A.

The storm water pipe to comply with BS 556.

Minimum slope in the drain to be 1%.

No chases will be allowed in the slabs for the pipes .Sleeves will be allowed with written approval of thr SE.No cutting of concrete without the express approval of the Architect or S.E.

All testing of pipes must be completed before plastering.

All mechanical work must be coordinated with electrical and any conflicts must be clarified before work begins.

PV denotes permanent ventilation.

Electrical Information

All conduits must be laid before plastering

All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50mm stone dust, on hardcore.

All soil under slabs and all around external foundations to be poisoned for termite control.

All soils on cut embankments to be stabilized. The slope not to exceed the natural angle

 

House Plan File Detail

Format: pdf
Size: 209 kb